gitoria

tickets

All repositories: gitoria

ReadmeCodePull requestsReleasesTicketsSettings
Branchl33-thinecd7e226|||PR Consolidate login and move handler logic into topic libraries (partial)mrel33-thin/missions/022-theme.md

1.6 KB

  1. # Mission 022 — tickets onto the shared layouts theme, MOBILE FIRST (step 1)
  2. Worker X2 (Sonnet), Atlas, 2026-10-21. Branch `w30-theme` from 31cabfc (= live). Not deployed, not pushed.
  3. Plan: layouts docs/usage.md "the other apps onto the theme, one by one" (creator: yes). Model: gitoria reports 005 (mobile first), 007 (theme taps).
  4. Source of the theme: layouts.worldapi.org main dbe3de7, `theme/` copied verbatim (`git archive dbe3de7 theme`), `shared/tokens.hl` already byte-equal.
  5. Step 1 (this mission, stop after ~60 requests or one finished step):
  6. - copy theme/ verbatim, record the source; theme/check-theme.mjs into the deploy gates
  7. - shell on the theme's AppHeader / UserMenu / Sidebar / ContentFirst (+ MainMenu)
  8. - drop tickets' own styles the theme covers; keep ticket list, history, state badges
  9. - 390 audit of every page: list, ticket, new ticket, project settings, inbox, login-failed — 0 taps < 44, 0 wider than 390, 0 inputs < 16 px, check-theme 0, before vs after
  10. - proof: tests/browser.mjs (377/0), tests/events.mjs (52/0) old vs new; tests adapted only where selectors changed
  11. - E2E in lisbeth's real Chrome (ONE existing tab, Page.bringToFront, no /json/new, no clipboard) on a COPY of the newest backup, 390 and 1280, real clicks: list, open a ticket, comment with attachment, change state, user menu, sidebar, settings; shots before/after
  12. Rules: ports 8732–8739, 8750–8759; no hand-written JS outside tests/ and theme/check-theme.mjs; a Hybriel gap → STOP + repro in scratch/probe; no attribution lines in commits; no deploy/push/.env; kill only own PIDs; no load generators; nothing of mine listens at the end.

Branches

Latest commits

  • ecd7e226|||PR Consolidate login and move handler logic into topic libraries (partial)mre
  • 6dea1c60Merge branch 'r35-day72' into mainTickets
  • 7bcfdc22|||PR drop worker edits to conductor recordsmre
  • 2617b6ee|||PR dialogs: host flag cleared on close, dialog gate (tickets#40)mre
  • 6e701371|||PR record partial day72 dialog validationmre
  • b9fb9a91|||PR bind ticket dialog visibility to member flagsmre
  • 0788e65f|||PR re-vendor Hybriel day72mre
  • e2a6bdcfMerge branch 'records-t35' into mainTickets
  • d8d54df1|||PR records: R35 day72 + #40mre
  • 8a7f475aMerge branch 'records-t33' into mainTickets
  • e685d0c2|||PR records: PROCEDURES merge callmre
  • b42aff2b|||PR records: GO 2026-11-23, workers L33 O34, PROCEDURES.mdmre
  • ed091d44Merge branch 'records' into mainTickets
  • 180c0cdb|||PR records: ticket move live (M32), hybriel#439mre
  • 497cae7bMerge branch 'm32-move' into mainTickets
  • 772e0696|||PR Allow project admins to move tickets between their projectsmre
  • be92a560Merge branch 'records' into mainTickets
  • 0daf2ea8|||PR records: PR-only workflow, #50 donemre
  • 0185d0b6Log PR 1 deploymre
  • f5bf16e2Mission 031: deploy PR 1mre