gitoria

tickets

All repositories: gitoria

ReadmeCodePull requestsReleasesTicketsSettings
Branchl33-thinecd7e226|||PR Consolidate login and move handler logic into topic libraries (partial)mrel33-thin/Dockerfile

503 B

  1. # Runtime image for the vendored hybriel binary on Byrodin: debian 12 (GLIBC_2.36) plus
  2. # OpenSSL 3 and CA certificates. hl:smtp / hl:fetch load libssl.so.3 + libcrypto.so.3 at
  3. # runtime and verify against the system CAs — debian:12-slim alone has neither, so mail
  4. # failed with "TLS is unavailable" (2026-09-24). Built by `docker compose up -d --build`.
  5. FROM debian:12-slim
  6. RUN apt-get update \
  7. && apt-get install -y --no-install-recommends libssl3 ca-certificates \
  8. && rm -rf /var/lib/apt/lists/*

Branches

Latest commits

  • ecd7e226|||PR Consolidate login and move handler logic into topic libraries (partial)mre
  • 6dea1c60Merge branch 'r35-day72' into mainTickets
  • 7bcfdc22|||PR drop worker edits to conductor recordsmre
  • 2617b6ee|||PR dialogs: host flag cleared on close, dialog gate (tickets#40)mre
  • 6e701371|||PR record partial day72 dialog validationmre
  • b9fb9a91|||PR bind ticket dialog visibility to member flagsmre
  • 0788e65f|||PR re-vendor Hybriel day72mre
  • e2a6bdcfMerge branch 'records-t35' into mainTickets
  • d8d54df1|||PR records: R35 day72 + #40mre
  • 8a7f475aMerge branch 'records-t33' into mainTickets
  • e685d0c2|||PR records: PROCEDURES merge callmre
  • b42aff2b|||PR records: GO 2026-11-23, workers L33 O34, PROCEDURES.mdmre
  • ed091d44Merge branch 'records' into mainTickets
  • 180c0cdb|||PR records: ticket move live (M32), hybriel#439mre
  • 497cae7bMerge branch 'm32-move' into mainTickets
  • 772e0696|||PR Allow project admins to move tickets between their projectsmre
  • be92a560Merge branch 'records' into mainTickets
  • 0daf2ea8|||PR records: PR-only workflow, #50 donemre
  • 0185d0b6Log PR 1 deploymre
  • f5bf16e2Mission 031: deploy PR 1mre